Site icon Socotra Online | سقطرى أون لاين

Supporting Adnoc Plant in Sheikh Zayed with Power Generators by Khalifa Foundation

November 15, 2020 –Socotra Online

Reporting and Photography: Mohamed Saeed bin Mohaimeed

Khalifa bin Zayed Al Nahyan Foundation through Dexam Power and Water Technology supported Adnoc plant with power generators with an operational capacity up to 7 megawatt and up to 10 megawatt during the following months to cover all suburbs of Hadiboh.

The capital of the Socotra Archipelago suffered from poor electricity due to the increased demand on the plant, which negatively affected the operational capacity of the plant.

In this regard, the people of Hadiboh commended the great role of Khalifa Foundation in relation with finding out solutions for elimination of suffering of people of Socotra in Hadiboh.

Exit mobile version